Infrastructure

Total Plinth area of the building : 1375m2

Sr.No Name of Section/Trade Area reqd. as per Norms(Sq.mts) Area available (Sq.mts) Floor
1 Principal Office 20 23.49 M2 Ground Floor
2 Staff room 20 30.38m2 Ground Floor
3 Placement with counseling Room 20 32.27 m2 2nd Floor
4 Reception Cum Waiting Room 40 49.24m2 Ground Floor
5 Electrician Workshop 98m2 102.58m2 Ground floor
6 Library 40 39.77m2 2nd Floor
7 Canteen Desirable 32.28 2nd Floor
8 Drawing room 50 85.55m2 Basement
9 Record room Desirable 13.42m2 Ground Floor
10 Stationery Room Desirable 11.07m2 Ground Floor
11 Electrician Lab 2 110 102.58m2 1st Floor
12 Electrician Theory Room 25 31.11 2nd Floor
13 POCM Lab 84 91.85+ 41.05 m2 Basement
14 POCM Theory Room 25 31.11 2nd Floor
15 COPA Lab 75 86.23 1stFloor
16 COPA Theory Room 25 30.69 1st Floor
17 Fitter Lab 88 90.12m2 Basement
18 Fitter Theory Room 25m2 32.27 2ndfloor
19 IT Lab 25m2 40m2 2ndfloor
ITI Sport News INFO
All the latest school sport and grass roots reports on ITI Sport. News, reports, analysis and more.
SEE ALL